You have $50K-$200K worth of equipment spread across your operations. Pumps, compressors, tanks, generators, separators, meters.
You probably track it in a spreadsheet. Maybe you know where most of it is. Maybe you have maintenance records (somewhere). Maybe you know what each piece of equipment is costing you.
Or maybe you don't.
Here's what we've learned from helping Permian Basin operators fix their equipment tracking—and why it matters more than you think.
Why Equipment Tracking Matters
Problem 1: Lost or Misplaced Equipment
Real Story: 75-well operator couldn't find a $12K pump. Last seen at Well 15H. Not there anymore. Checked 10 other wells. Never found it.
How This Happens:
- Move equipment between wells
- Don't update records
- Field changes not communicated to office
- No systematic tracking
Cost:
- Equipment loss: $5K-$25K per item
- Replacement purchases: Buying equipment you already own
- Time wasted searching: 4-8 hours looking for "lost" equipment
Annual Impact: Small operator: $10K-$30K Mid-size operator: $30K-$100K
Problem 2: No Maintenance History
The Scenario: Pump fails at Well 22. Questions:
- When was it last serviced?
- What was replaced last time?
- Is this the pump that always has problems?
- Is it under warranty?
Without tracking: Nobody knows. Start from scratch every time.
Impact:
- Repeat same problems
- Miss warranty claims
- Can't identify problem equipment
- Over-maintain or under-maintain
Example: Replace pump ($8K). Same pump fails 3 months later. Check records (don't exist). Turns out this pump has failed 3 times in 2 years. Should have been scrapped long ago.
Cost: Unnecessary repairs, wasted time, poor decisions.
Problem 3: Unknown True Equipment Costs
The Question: "What's our pump cost per barrel?"
Without Tracking: Can't answer. Don't know:
- Total equipment investment
- Repair history per piece
- Run hours
- Production per equipment
Impact:
- Can't evaluate equipment ROI
- Don't know which equipment types work best
- Can't justify capital requests
- Miss optimization opportunities
Example: Operator has 20 pumps (mix of brands). Which brand is most cost-effective? Without tracking, impossible to know.
Problem 4: Inefficient Maintenance
Reactive Maintenance: Fix it when it breaks (expensive, disruptive).
Time-Based Maintenance: Service every X months (regardless of actual condition).
Neither is Optimal:
Better Approach: Condition-based maintenance (using actual equipment data).
Requirements:
- Run hours tracked
- Maintenance history tracked
- Performance monitored
- Patterns analyzed
Without Tracking: Stuck with reactive or time-based.
What Good Equipment Tracking Looks Like
Core Data to Track
1. Equipment Master Data
- Unique ID (asset tag number)
- Type (pump, compressor, tank, etc.)
- Make and model
- Serial number
- Specifications
- Purchase date and cost
- Vendor
- Warranty information
- Expected life
2. Location and Status
- Current location (which well, which facility)
- Installation date
- Status (operating, standby, repair, retired)
- Last movement date
- Movement history
3. Maintenance History
- All service events
- Date and description
- Parts replaced
- Cost (labor + parts)
- Performed by (company or person)
- Next service due
- Warranty claims
4. Performance Data
- Run hours (from SCADA or meter)
- Production supported
- Efficiency metrics
- Failure events
- Downtime
5. Financial Data
- Purchase cost
- Depreciation
- Total maintenance cost to date
- Cost per hour
- Cost per barrel
- Current book value
Common Mistakes to Avoid
Mistake 1: Over-Complicating It
The Problem: Try to track everything. 50 fields per equipment item. Nobody wants to enter that much data.
Result: System sits unused. Back to spreadsheets.
Better Approach:
- Start with essentials (ID, type, location, status)
- Add more fields later as needed
- Make it easy to use
Mistake 2: Not Tracking Costs
The Problem: Track physical data (location, specs) but not financial (costs).
Result: Can't answer ROI questions. Can't justify equipment decisions.
Better Approach: Track costs from day one. Purchase price, every repair, every part.
Mistake 3: No Photos
The Problem: "Pump at Well 15" - but which pump?
Better: Photo of equipment (nameplate visible). Now you know exactly which pump.
Implementation: Phone camera → attach to equipment record. Easy.
Mistake 4: No QR Codes or Asset Tags
The Problem: Equipment has no physical identifier. Confusion about which unit is which.
Better:
- Print QR code labels
- Attach to equipment
- Scan with phone → instant access to records
Cost: $1-2 per label (buy QR label printer for $200).
Mistake 5: Inconsistent Updates
The Problem: Track for 3 months. Stop updating. Data becomes stale.
Result: Garbage data. Nobody trusts it.
Better:
- Integrate with operational workflows
- Automatic updates where possible (SCADA for run hours)
- Make updates mandatory (can't close work order without updating equipment)
Technology Solutions
Option 1: Spreadsheet (Don't)
Why Operators Start Here:
- Free (already have Excel)
- Familiar
- Quick to set up
Why It Doesn't Work:
- No automatic updates
- One person edits at a time
- No photos or QR codes
- No integration with SCADA
- Lost when computer dies
- Version control nightmare
Verdict: Better than nothing, but barely. You'll outgrow it fast.
Option 2: Generic Asset Tracking Software
Examples:
- EZOfficeInventory
- Asset Panda
- Sortly
Pros:
- Affordable ($50-$200/month)
- Mobile apps
- QR code support
- Easy to use
Cons:
- Not built for oil & gas
- No SCADA integration
- No production correlation
- No run-hour tracking
- Generic reports
Verdict: Works for small operators (<20 wells). Limited for larger operations.
Option 3: Enterprise Maintenance Management (CMMS)
Examples:
- Maximo
- SAP PM
- eMaint
Pros:
- Comprehensive
- Maintenance workflows
- Work order management
- Preventive maintenance scheduling
Cons:
- Expensive ($10K-$50K+ annually)
- Complex implementation
- Overkill for independents
- Requires dedicated staff
Verdict: Only for large operators (500+ wells) with full maintenance teams.
Option 4: Custom Solution or WellPulse
What It Is: Equipment tracking built into production management platform.
Pros:
- Integrated with production data
- SCADA integration (automatic run hours)
- Cost per barrel calculations
- Mobile app with QR codes
- Right-sized for independents
Cons:
- More expensive than generic tools
- Requires implementation
Verdict: Sweet spot for 50-500 well operators.
Implementation: How to Do It Right
Step 1: Equipment Inventory (Week 1-2)
Process:
- Walk every well site and facility
- Document every piece of equipment
- Take photos (nameplate visible)
- Record type, make, model, serial number
- Note current location
Team:
- Operations manager + field supervisor
- 1-2 days per 50 wells
Output: Master list of all equipment.
Pro Tip: Find equipment you forgot you had. Typical: 5-10% of equipment "rediscovered."
Step 2: Historical Data Gathering (Week 2-3)
What to Collect:
- Purchase records (invoices, POs)
- Maintenance records (work orders, receipts)
- Warranty information
- Any existing spreadsheets or records
Reality: Won't have complete history. That's OK.
Approach:
- Enter what you have
- Going forward: Track everything
Step 3: System Setup (Week 3-4)
If Using WellPulse or Custom:
- Import equipment list
- Configure equipment types
- Set up mobile app
- Create QR code labels
- Train team
Timeline: 2-3 weeks
Step 4: Tagging and Deployment (Week 5)
Process:
- Print QR code labels
- Physically tag each piece of equipment
- Take photo of tagged equipment
- Update location in system
- Test scanning with mobile app
Team: Field staff + operations
Timeline: 1-2 days
Step 5: Operational Integration (Week 6+)
Make It Part of Workflow:
When Moving Equipment:
- Scan QR code
- Update location in app
- Document reason for move
When Performing Maintenance:
- Scan equipment QR code
- Log work performed
- Record costs
- Note parts replaced
- Schedule next service
When Equipment Fails:
- Scan QR code
- Log failure event
- Tie to work order
- Track resolution
Result: Data stays current without extra effort.
Advanced Features
Predictive Maintenance
Once You Have Data:
- Analyze failure patterns
- Identify early warning signs
- Predict failures 2-4 weeks early
- Schedule preventive maintenance
Requirements:
- 6-12 months data
- SCADA integration (run hours, performance)
- Failure event history
Value: 30-50% reduction in unplanned downtime.
Equipment Economics
With Cost Tracking: Calculate per-equipment metrics:
- Cost per run hour
- Cost per barrel produced
- ROI per equipment type
- Brand/model performance comparison
Use Cases:
- Justify equipment purchases
- Identify underperforming equipment
- Optimize equipment allocation
- Vendor performance analysis
Example Analysis: Brand A pumps: $0.80/barrel Brand B pumps: $1.20/barrel
Decision: Buy more Brand A, phase out Brand B.
Equipment Lifecycle Management
Track Full Lifecycle:
- Purchase → Installation → Operation → Maintenance → Retirement
Benefits:
- Know when to retire vs. repair
- Plan capital replacement cycles
- Optimize depreciation schedules
- Improve budgeting
Vendor Performance
With Maintenance Data: Track vendor performance:
- Average repair time
- Repair quality (do problems recur?)
- Cost competitiveness
- Warranty claim success rate
Use Cases:
- Vendor selection
- Contract negotiations
- Performance accountability
Case Study: 85-Well Permian Operator
Starting Point:
- Equipment tracked in Excel (partially)
- No maintenance history
- Frequent "lost" equipment
- No cost per barrel data
- Reactive maintenance only
Implementation:
- 6-week project
- Equipment tracking module in WellPulse
- Inventoried 145 major equipment items
- QR coded everything
- Mobile app for field updates
Investment: $22K (included in WellPulse subscription + QR labels + 1 day consulting)
Results After 6 Months:
Equipment Found:
- 2 "lost" pumps found ($18K value)
- 1 compressor forgotten at old site ($25K value)
- $8K in spare parts discovered in truck
Maintenance Improvements:
- Identified 3 problem pumps (replaced vs. continuing to repair)
- Shifted to condition-based maintenance
- 25% reduction in maintenance costs ($15K)
Cost Insights:
- Calculated cost per barrel by equipment type
- Identified most cost-effective pump brand
- Justified capital equipment investment to board
Total Value Year 1: $66K ROI: 200%
Operator Quote: "I can finally answer the question: 'Where is that pump?' And more importantly: 'Is it worth fixing or should we replace it?'"
Best Practices Summary
1. Start Simple Track essentials first. Add complexity later.
2. Use QR Codes Physical labels make scanning easy.
3. Integrate with Operations Make tracking part of normal workflow.
4. Track Costs Financial data is as important as physical data.
5. Take Photos Pictures prevent confusion.
6. Make Updates Easy Mobile app, not paperwork.
7. Analyze Regularly Monthly review of equipment performance.
8. Plan Lifecycle Know when to repair vs. replace.
Take Action
Equipment Tracking in WellPulse:
- Equipment database
- Mobile app with QR scanning
- Maintenance history
- Cost tracking
- Run-hour integration (from SCADA)
- Included in WellPulse platform
Pricing:
- Included in $10-30/well/month
- Implementation included
Download Equipment Tracking Best Practices Guide →